Friday, June 5, 2015

Old Bridge Project Closes Riverside Section for Months

Posted By on Fri, Jun 5, 2015 at 3:07 PM

click to enlarge Phase 2 of TDOT's I-55 interchange plan - TENNESSEE DEPARTMENT OF TRANSPORTATION
  • Tennessee Department of Transportation
  • Phase 2 of TDOT's I-55 interchange plan



Riverside Drive will be closed for 21 months from Crump to Carolina during the three-year construction project to build a new interchange at I-55 and Crump Boulevard, according to Tennessee Department of Transportation [TDOT] officials.

During the closure, north-bound traffic into Downtown Memphis (that is now carried by Riverside Drive) will be diverted from I-55 to the McLemore Avenue exit, then north on Florida Street, then east on Georgia Avenue, to continue north on Front Street (behind Central Station).

This detail of the plan was revealed during Thursday evening’s meeting on the topic in Memphis, according to the project manager, TDOT’s Steve Chipman.

The stretch of Riverside will remain open during the first 12 months of the project, which starts at the beginning of 2016. But the I-55 northbound exit from Riverside will be closed to build a railroad access road. Also, the Riverside exit to Crump heading east will be closed for the 12-month period to build the I-55 southbound ramp.

PDF phase_2.pdf
Tennessee Department of Transportation

But Riverside Drive from Crump to Carolina will be completely closed for nine months, during the second phase of construction, which starts at the beginning of 2017. I-55 will also be completely closed during this time from the McLemore Ave. interchange all the way to Channel 3 Drive. The southbound detour from Riverside is Riverside to Carolina to Florida Street to McLeMore.



click to enlarge Phase 3 of TDOT's I-55 interchange plan. - TENNESSEE DEPARTMENT OF TRANSPORTATION
  • Tennessee Department of Transportation
  • Phase 3 of TDOT's I-55 interchange plan.


Riverside from Crump to Carolina will remain closed for 12 months during the third phase of construction, which begins late 2017. The same detour heading south applies during that time (Riverside to Carolina to Florida to Crump). Northbound detour is the same, too (McLemore, to Florida, Georgia, to Front Street).

But I-55 traffic will be open during the third phase to the new south-bound I-55 lanes. The north-bound lanes will remain closed as crews build the interchange bridges and the roundabout. 

Comments (4)

Showing 1-4 of 4

Add a comment

 
Subscribe to this thread:
Showing 1-4 of 4

Add a comment

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT

Readers also liked…

  • Contemporary Media Inc. Hires Michael Donahue

    • Apr 27, 2017
  • Memphis' "Summer of Fear"

    Thirty-seven years ago this week, Memphis became a city in fear. In the late summer of 1969, a cold-blooded killer stalked the streets, and over a period of 28 days, police made one grisly discovery after another. In the end, the slayer was captured after a wild chase by a posse of ordinary citizens. After his arrest, George Howard Putt told reporters, “I’d do it all again.” The murder spree began on the afternoon of August 14, 1969 ...
    • Mar 16, 2016
  • Memphis Shelby Crime Commission Hires Harold Collins

    • Sep 8, 2016
ADVERTISEMENT
ADVERTISEMENT
© 1996-2017

Contemporary Media
460 Tennessee Street, 2nd Floor | Memphis, TN 38103
Visit our other sites: Memphis Magazine | Memphis Parent | Inside Memphis Business
Powered by Foundation